Pages from a completed audit of a Mexican manufacturing plant. Client name, address, and account data have been removed. Everything else is presented as delivered.
A full Level 2 audit package combining field evidence, engineering analysis, and implementation priorities for management review.Average hourly electricity demand by month, 2021 to 2023, reconstructed from three years of CFE billing history.Reference-year baseline across two CFE contracts and onsite solar, with base, intermediate, and punta energy, billable demand, and power factor by period.Pump selection for the chilled-water system, including equipment dimensions, hydraulic performance curves, operating point, and materials specifications.Summary of eight measures: energy saving, annual pesos, investment, and payback in years.Inside the plant: process equipment documented in the field and connected to operating context before recommendations are developed.
Figures shown are for one facility with its own baseline and tariff. Identified savings have not been verified under M&V. MEP does not guarantee savings.
Review the depth of the deliverable, then speak with MEP about the facility, the decision, and the appropriate next step.
Each card states what MEP measured, what changed, and the operating condition that decided the result. Ranges are measured across plants of the same type; the figure for one site depends on its own baseline and tariff. Client identities are confidential.
Industry
Region
Showing 8 of 8 engagements
Completed engagement · Northern Mexico
Automotive OEM assembly
6–11%lower total electricity cost
Scope
Fifteen-minute interval analysis, peak demand controls, power factor and power quality screening, and submetering of the utility systems.
Also measured
8–15% lower peak kW and fewer nuisance trips during voltage events.
Simple payback
9 to 18 months
What decided the resultPeak savings depend on how spiky the top five intervals are and how strictly operations can hold a demand cap.
Chiller plant optimization, air handler scheduling inside compliance constraints, and energy management system monitoring.
Also measured
Improved audit readiness through better metering.
Simple payback
14 to 32 months
What decided the resultValidated setpoints are the constraint. Sequencing and part-load efficiency are the lever, and neither touches a validated condition.
No engagement matches both filters. Clear one to see the rest of the record.
Vendor-neutralCompensated only by the client
CEMCertified Energy Manager
CMVPCertified Measurement and Verification Professional
ISO 50001Lead Auditor
ASHRAEMember, ASHRAE 211 methodology
IPMVPVerified engagements
Since 2015Mexico City and New York
Feedback from operating and procurement teams
Organizations remain confidential. Verification contacts are available during qualified evaluation.
The energy audit recommendations were practical and supported by solid financial and operational rationale, making them easy to evaluate and act upon.
Lori C.
Procurement Manager, Global Auto Parts Supplier
The energy study was very well done and delivered real results. The team took the time to understand how our plant actually operates and provided clear, practical recommendations.
Ismael H.
Plant Manager, Global Mining Company
The support we received on our Power Purchase Agreement was excellent. The team conducted a detailed and professional review.
Héctor V.
Plant Manager, Global Battery Manufacturer
Feedback from completed engagements. Client identities remain confidential. Individual results depend on facility profile, tariff, contract terms, and execution.
Request an assessment. Get a preliminary analysis in 1 business day.
MEP will show you where cost and risk sit at this plant before you commit to anything. Four fields to start.
Reply from a senior advisor, not a sales team
NDA available before any document is shared
MEP sells no equipment and takes no supplier commissions