Completed outcome

22% lower energy cost across a Mexico City commercial campus

Large commercial campus · Mexico City

Situation

The campus carried varied building loads and needed a clear view of which operating, system, and commercial actions should move first.

Technical and commercial measures were evaluated against one baseline before management committed resources.

Work performed

  • Facility energy baseline
  • Technical measure review
  • Commercial option analysis
  • Management decision package

Findings

The baseline, decision, and outcome remain distinct

Management received one documented case for operating and commercial action with the assumptions visible.

Baseline

Building and common system conditions were placed on a shared cost basis.

Decision

Technical and commercial measures were reviewed together rather than as separate vendor proposals.

Outcome

The completed engagement supported a 22% reduction in energy cost.

For internal circulation

Request the case study PDF

The PDF is prepared for plant, finance, procurement, engineering, and sustainability teams evaluating a similar decision.

  • Vendor-neutralCompensated only by the client
  • CEMCertified Energy Manager
  • CMVPCertified Measurement and Verification Professional
  • ISO 50001Lead Auditor
  • ASHRAEMember, ASHRAE 211 methodology
  • IPMVPVerified engagements
  • Since 2015Mexico City and New York