MXN 161.7 million in projected annual savings against the documented modeled case.
Modeled opportunity
MXN 161.7M a year in modeled cogeneration savings at an energy-intensive plant
Energy-intensive industrial facility · Mexico
Situation
The facility required a documented comparison of onsite generation and utility system opportunities before committing capital.
A documented facility baseline was used to model cogeneration and utility system economics, payback, and projected emissions impact.
Work performed
- Documented facility baseline
- Integrated utility analysis
- Capital and operating model
- Sensitivity and implementation review
Findings
The baseline, decision, and outcome remain distinct
The model kept baseline, capital, operating, and emissions assumptions visible so management could test the opportunity before approval.
55.99% modeled energy cost reduction and a simple payback of 3.45 years.
6.13 million kg of projected annual CO2 avoided under the stated operating assumptions.
For internal circulation
Request the case study PDF
The PDF is prepared for plant, finance, procurement, engineering, and sustainability teams evaluating a similar decision.
- Vendor-neutralCompensated only by the client
- CEMCertified Energy Manager
- CMVPCertified Measurement and Verification Professional
- ISO 50001Lead Auditor
- ASHRAEMember, ASHRAE 211 methodology
- IPMVPVerified engagements
- Since 2015Mexico City and New York