Modeled opportunity

MXN 161.7M a year in modeled cogeneration savings at an energy-intensive plant

Energy-intensive industrial facility · Mexico

Situation

The facility required a documented comparison of onsite generation and utility system opportunities before committing capital.

A documented facility baseline was used to model cogeneration and utility system economics, payback, and projected emissions impact.

Work performed

  • Documented facility baseline
  • Integrated utility analysis
  • Capital and operating model
  • Sensitivity and implementation review

Findings

The baseline, decision, and outcome remain distinct

The model kept baseline, capital, operating, and emissions assumptions visible so management could test the opportunity before approval.

Cost

MXN 161.7 million in projected annual savings against the documented modeled case.

Economics

55.99% modeled energy cost reduction and a simple payback of 3.45 years.

Emissions

6.13 million kg of projected annual CO2 avoided under the stated operating assumptions.

For internal circulation

Request the case study PDF

The PDF is prepared for plant, finance, procurement, engineering, and sustainability teams evaluating a similar decision.

  • Vendor-neutralCompensated only by the client
  • CEMCertified Energy Manager
  • CMVPCertified Measurement and Verification Professional
  • ISO 50001Lead Auditor
  • ASHRAEMember, ASHRAE 211 methodology
  • IPMVPVerified engagements
  • Since 2015Mexico City and New York