Lower power cost at the mine. Keep the mill running.

MEP evaluates large motor loads, power quality, onsite generation, storage, fuel, and grid conditions against production and remote site constraints.

Start with one site or a complete facility list. NDA available before data is shared.
Selected mining and metals relationships

Relevant operating experience for mining and metals decision makers

Selected client relationships. Scope varies by organization. Confidential assignments remain unnamed.

Energy issues that affect operations

MEP tests each opportunity against production, quality, reliability, and capital requirements before recommending action.

Loads are concentrated

Crushing, grinding, pumping, ventilation, and conveying can shape peaks and power quality conditions.

Evidence to connectMotor loads, starts, demand profile, harmonics

Distance changes resilience

Weak grid conditions, fuel logistics, and access can raise the consequence and duration of interruptions.

Evidence to connectGrid events, fuel autonomy, recovery time

Output is the true denominator

Energy performance must be read against ore characteristics, throughput, recovery, and operating hours.

Evidence to connectkWh per tonne, production state, run hours

Fieldwork follows the operating condition

Measurements and site conditions define the scope. Technology selection follows the baseline and constraint review.

Electrical distribution

Review incoming supply, protection, large motors, power quality, and critical load hierarchy.

First lookSingle-line diagrams, event logs, motor list, protection data

Onsite power and storage

Compare generation and storage architectures against outage cost, fuel, and site conditions.

First lookLoad duration, critical loads, fuel and solar resource

Pumping and ventilation

Evaluate system curves, controls, schedules, and production dependencies.

First lookFlow, head, pressure, operating schedule

Supply and tariff

Test commercial options with congestion, basis, volume, and contract exposure visible.

First lookBills, interval data, contracts, forecasts

What each decision owner must approve

The analysis gives each owner the information needed to test assumptions and approve, revise, defer, or stop the work.

Decision ownerQuestion to answerMEP output
Site operations

Which loads determine safe and productive operation?

Critical load hierarchy and recovery sequence

Technical services

What is causing avoidable electrical or system loss?

Measurements, system models, and findings

Finance

What is reliability worth per tonne?

Interruption cost and generation scenario model

Corporate procurement

Which commercial terms shift risk back to the site?

Normalized supply and infrastructure evaluation

Energy intensity and resilience assessment

MEP confirms scope after reviewing the facility profile, the current decision, and the available operating data.

Request the starting review
Management outputs
  • Energy baseline normalized for production
  • Electrical reliability and power quality review
  • Onsite generation and storage scenarios
  • Capital and procurement decision memo

Share the site list, current decision, and available evidence.

An MEP advisor will provide an initial review within 1 business day and state whether further diagnostic work is warranted.

Request a portfolio review
  • Vendor-neutralCompensated only by the client
  • CEMCertified Energy Manager
  • CMVPCertified Measurement and Verification Professional
  • ISO 50001Lead Auditor
  • ASHRAEMember, ASHRAE 211 methodology
  • IPMVPVerified engagements
  • Since 2015Mexico City and New York

Feedback from operating and procurement teams

Organizations remain confidential. Verification contacts are available during qualified evaluation.

The energy audit recommendations were practical and supported by solid financial and operational rationale, making them easy to evaluate and act upon.

Lori C. Procurement Manager, Global Auto Parts Supplier

The energy study was very well done and delivered real results. The team took the time to understand how our plant actually operates and provided clear, practical recommendations.

Ismael H. Plant Manager, Global Mining Company

The support we received on our Power Purchase Agreement was excellent. The team conducted a detailed and professional review.

Héctor V. Plant Manager, Global Battery Manufacturer

Feedback from completed engagements. Client identities remain confidential. Individual results depend on facility profile, tariff, contract terms, and execution.

Request an assessment. Get a preliminary analysis in 1 business day.

MEP will show you where cost and risk sit at this mine site before you commit to anything. Four fields to start.

  • Reply from a senior advisor, not a sales team
  • NDA available before any document is shared
  • MEP sells no equipment and takes no supplier commissions

Facility data is treated as confidential. An NDA is available before any document changes hands.