Technical, legal, and efficiency engineering from one team

MEP combines utility data, field findings, and financial analysis in a record that management can approve and execute. Each stage answers a defined question before more time or capital is committed.

Resolve the question before expanding the scope

The work can stop, narrow, or change direction at every gate.

  1. Frame

    Start with the operating and financial question

    Define the site context, decision owner, consequence, and timing.

    Is there a material decision worth investigating?
  2. Baseline

    Use available data to define the issue

    Review bills, load data, schedules, and facility information.

    What must be measured or excluded?
  3. Validate

    Measure in the context of production

    Test assumptions during representative operating periods.

    Does the evidence support the case?
  4. Build

    Put engineering, economics, and risk together

    Compare capital, savings logic, dependencies, and sensitivities.

    Approve, defer, redesign, or stop?
  5. Execute

    Protect the approved case

    Support bids, technical review, commissioning, and M&V.

    Did delivery match the approved case?

From a completed Level 2 audit

What a Level 2 audit looks like

Pages from a completed audit of a Mexican manufacturing plant. Client name, address, and account data have been removed. Everything else is presented as delivered.

A full Level 2 audit package combining field evidence, engineering analysis, and implementation priorities for management review. Page from a Mexico Energy Partners Level 2 industrial energy audit
A full Level 2 audit package combining field evidence, engineering analysis, and implementation priorities for management review.
Average hourly electricity demand by month, 2021 to 2023, reconstructed from three years of CFE billing history. Page from a Mexico Energy Partners Level 2 industrial energy audit
Average hourly electricity demand by month, 2021 to 2023, reconstructed from three years of CFE billing history.
Reference-year baseline across two CFE contracts and onsite solar, with base, intermediate, and punta energy, billable demand, and power factor by period. Page from a Mexico Energy Partners Level 2 industrial energy audit
Reference-year baseline across two CFE contracts and onsite solar, with base, intermediate, and punta energy, billable demand, and power factor by period.
Pump selection for the chilled-water system, including equipment dimensions, hydraulic performance curves, operating point, and materials specifications. Page from a Mexico Energy Partners Level 2 industrial energy audit
Pump selection for the chilled-water system, including equipment dimensions, hydraulic performance curves, operating point, and materials specifications.
Summary of eight measures: energy saving, annual pesos, investment, and payback in years. Page from a Mexico Energy Partners Level 2 industrial energy audit
Summary of eight measures: energy saving, annual pesos, investment, and payback in years.
Inside the plant: process equipment documented in the field and connected to operating context before recommendations are developed. Page from a Mexico Energy Partners Level 2 industrial energy audit
Inside the plant: process equipment documented in the field and connected to operating context before recommendations are developed.

Figures shown are for one facility with its own baseline and tariff. Identified savings have not been verified under M&V. MEP does not guarantee savings.

Review the depth of the deliverable, then speak with MEP about the facility, the decision, and the appropriate next step.

  • Vendor-neutralCompensated only by the client
  • CEMCertified Energy Manager
  • CMVPCertified Measurement and Verification Professional
  • ISO 50001Lead Auditor
  • ASHRAEMember, ASHRAE 211 methodology
  • IPMVPVerified engagements
  • Since 2015Mexico City and New York

Feedback from operating and procurement teams

Organizations remain confidential. Verification contacts are available during qualified evaluation.

The energy audit recommendations were practical and supported by solid financial and operational rationale, making them easy to evaluate and act upon.

Lori C. Procurement Manager, Global Auto Parts Supplier

The energy study was very well done and delivered real results. The team took the time to understand how our plant actually operates and provided clear, practical recommendations.

Ismael H. Plant Manager, Global Mining Company

The support we received on our Power Purchase Agreement was excellent. The team conducted a detailed and professional review.

Héctor V. Plant Manager, Global Battery Manufacturer

Feedback from completed engagements. Client identities remain confidential. Individual results depend on facility profile, tariff, contract terms, and execution.

Request an assessment. Get a preliminary analysis in 1 business day.

MEP will show you where cost and risk sit at this facility before you commit to anything. Four fields to start.

  • Reply from a senior advisor, not a sales team
  • NDA available before any document is shared
  • MEP sells no equipment and takes no supplier commissions

Facility data is treated as confidential. An NDA is available before any document changes hands.